{"id":26795,"date":"2024-12-01T12:02:37","date_gmt":"2024-12-01T17:02:37","guid":{"rendered":"https:\/\/www.laval.ca\/travaux-routiers-menes-ville-laval\/"},"modified":"2026-03-03T09:55:58","modified_gmt":"2026-03-03T14:55:58","slug":"roadworks-city-laval","status":"publish","type":"page","link":"https:\/\/www.laval.ca\/en\/roadworks-mobility\/roadworks\/roadworks-sites\/roadworks-city-laval\/","title":{"rendered":"Road work carried out by the City of Laval"},"content":{"rendered":"\n<p class=\"is-style-intro-text\">Pour pr\u00e9parer vos d\u00e9placements, voici ce que vous devez savoir sur les travaux men\u00e9s pr\u00e9sentement par la Ville et ceux \u00e0 venir.\u00a0<\/p>\n<section class=\"sticky-section-group aligndefault\"\n>\n   \n<div class=\"sticky-section-main\"\n>\n   \n\n<h2 class=\"wp-block-heading\"><strong>Travaux en cours<\/strong><\/h2>\n\n\n\n<p>Rep\u00e9rez quelles rues seront entrav\u00e9es en raison de travaux.\u00a0<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/vl.maps.arcgis.com\/apps\/instant\/sidebar\/index.html?appid=729ff9eeb851437b9a4cf365efadfe8f\" target=\"_blank\" rel=\"noreferrer noopener\">Voir la carte\u00a0<\/a><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-vortex-blocks-accordions-group block-accordions-group accordion-container\" id=\"envergure\">\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"travaux-routiers-denvergure\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">Travaux routiers d\u2019envergure<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<p>Apprenez-en plus sur les travaux routiers d\u2019envergure men\u00e9s par la Ville de Laval.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">S\u00e9curisation et embellissement du boulevard Saint-Martin<\/h4>\n\n\n\n<p><strong>Description\u00a0:<\/strong>\u00a0Les travaux consistent \u00e0 remettre \u00e0 neuf la majorit\u00e9 des trottoirs ainsi qu\u2019\u00e0 installer des banquettes v\u00e9g\u00e9talis\u00e9es pour s\u00e9parer les voies cyclables et la voie de circulation automobile entre le boulevard Chomedey et l&#8217;avenue de la Mauricie. Elles rendront aussi les d\u00e9placements plus s\u00e9curitaires pour les usagers et usag\u00e8res. En plus de verdir et d\u2019embellir le boulevard, les banquettes aideront aussi \u00e0 r\u00e9duire les \u00eelots de chaleur et \u00e0 mieux g\u00e9rer l&#8217;eau de pluie.<\/p>\n\n\n\n<p><strong>Avancement des travaux :<\/strong> <\/p>\n\n\n\n<p>Les travaux du c\u00f4t\u00e9 nord sont termin\u00e9s. Du c\u00f4t\u00e9 sud, les travaux entre les boulevards Le Corbusier et Industriel et entre le boulevard des Laurentides et l&#8217;Avenue de la Mauricie seront termin\u00e9s d&#8217;ici la fin du mois de novembre. Les derni\u00e8res entraves routi\u00e8res seront alors retir\u00e9es.<\/p>\n\n\n\n<p>Les travaux du c\u00f4t\u00e9 sud sur les tron\u00e7ons suivants sont report\u00e9s \u00e0\u00a02026\u00a0:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>entre les boulevards Chomedey et Le Corbusier<\/li>\n\n\n\n<li>entre les boulevards Industriel et des Laurentides<\/li>\n<\/ul>\n<\/div><\/div><\/section>\n\n\n\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"reparations-et-interventions-imprevues\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">R\u00e9parations et interventions impr\u00e9vues<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<p>Travaux non planifi\u00e9s :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\u00c0 la suite d&#8217;un bris ou de dommages \u00e0 la route pouvant nuire \u00e0 la s\u00e9curit\u00e9 des usagers et usag\u00e8res. <\/li>\n\n\n\n<li>Interventions ponctuelles sur le territoire.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Boulevard des Prairies<\/h4>\n\n\n\n<p><strong>Description\u00a0:<\/strong> fermeture compl\u00e8te du boulevard des Prairies, entre la 55<sup>e<\/sup>\u00a0et la 61<sup>e<\/sup>\u00a0Avenue, du 27\u00a0f\u00e9vrier au 4\u00a0mars.<\/p>\n\n\n\n<p>Un chemin de d\u00e9tour est pr\u00e9vu par le boulevard Cartier.<\/p>\n<\/div><\/div><\/section>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Travaux \u00e0 venir<\/strong>\u00a0<\/h2>\n\n\n\n<p>Informez\u2011vous sur les travaux pr\u00e9vus cette ann\u00e9e dans votre quartier et sur les principales art\u00e8res.<\/p>\n\n\n\n<div class=\"wp-block-vortex-blocks-accordions-group block-accordions-group accordion-container\">\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"auteuil\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">Auteuil<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Debussy, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;extr\u00e9mit\u00e9 de la rue Debussy et le cours d&#8217;eau pr\u00e8s de la terrasse d&#8217;Auteuil<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9am\u00e9nagement de foss\u00e9<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Reprofilage du foss\u00e9 et installation d&#8217;un puisard lin\u00e9aire.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>4 mois<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Mille-\u00celes, boulevard des<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Pr\u00e9s du 541, boulevard des Mille-\u00celes<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Remplacement de ponceau et reprofilage de cours d&#8217;eau<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement du ponceau existant par une conduite en b\u00e9ton arm\u00e9 de grande ouverture pour en augmenter la capacit\u00e9. Reprofilage du cours d&#8217;eau et des foss\u00e9s \u00e0 proximit\u00e9 du ponceau pour am\u00e9liorer l&#8217;\u00e9coulement des eaux.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 semaine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">P\u00e9ladeau, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue de Prince-Rupert et le boulevard Ren\u00e9-Laennec<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Perrier, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue de Poitiers et la rue Pr\u00e9fontaine<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Plage-des-\u00celes, rue de la<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard des Mille-\u00eeles et l&#8217;\u00eele Saint-Joseph<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation du pont de l&#8217;\u00eele Saint-Joseph<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>\u00c0 confirmer<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Prince-Rupert, rue de<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Rancourt et la rue Parini<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Salvail, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Salois et la rue Saint-Sa\u00ebns Ouest<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Trevet, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;avenue des Lacasse et le boulevard Prudentiel<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div><\/div><\/section>\n\n\n\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"chomedey\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">Chomedey<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">85\u1d49 Avenue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Notre-Dame et la 7\u1d49 Rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">9\u1d49 Rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la 84\u1d49 Avenue et la 85\u1d49 Avenue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Albert-Murphy, avenue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Pouliot et le 1775, avenue Albert Murphy<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9paration de trottoirs<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Alen\u00e7on, avenue d&#8217;<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard de la Normandie et le boulevard de la Normandie<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement de la conduite d&#8217;aqueduc. \u00c9largissement des trottoirs en r\u00e9duisant la largeur de la chauss\u00e9e. Trottoir traversant \u00e0 l&#8217;intersection ouest.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Bladen, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard L\u00e9vesque Ouest et la rue Churchill<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9paration de trottoirs<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Bois-de-Boulogne, avenue de<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue de Gascogne et le boulevard du Souvenir<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Calvet, rue du<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le chemin du Sablon et le 824, rue du Calvet<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9paration de trottoirs<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Cosmod\u00f4me, avenue du<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;avenue Pierre-P\u00e9ladeau et la desserte ouest des Laurentides (A-15)<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Cur\u00e9-Labelle, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Saint-Elzear Ouest et le 2900, boulevard Cur\u00e9-Labelle<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Construction de trottoirs<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Ajout d&#8217;un trottoir en asphalte du c\u00f4t\u00e9 ouest.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 mois<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Cur\u00e9-Labelle, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;autoroutte 440 et le boulevard Cl\u00e9roux<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Installation d&#8217;une conduite d&#8217;\u00e9gout sanitaire dans la trav\u00e9e est.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Daniel-Johnson, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Souvenir et le boulevard Saint-Martin Ouest<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Daniel-Johnson, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Le Carrefour et le boulevard Saint-Martin Ouest<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Dufresne, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Lapalme et la rue d&#8217;I\u00e9na<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Edward, avenue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la 100\u1d49 Avenue et la rue Emerson<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Edward, place<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;avenue Edward et l&#8217;avenue Edward<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Favreau, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Cl\u00e9roux et la rue Fafard<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Fred-Barry, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Louise et le chemin O&#8217;Neil<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">I\u00e9na, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Saint-Martin Ouest et la rue Dufresne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Irma-Levasseur, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la voie de desserte de l&#8217;A-440 et la rue Louis-B.-Mayer<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Pavage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 semaine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Jacques-Bureau, avenue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Edmond-Rostand et l&#8217;approche de la desserte de l&#8217;autoroute 15<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Construction de trottoirs<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Ajout d&#8217;un trottoir du c\u00f4t\u00e9 est de la rue.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 mois<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Langelier, avenue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;avenue Laplante et le boulevard Tessier<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Lapalme, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Saint-Martin Ouest et le chemin du Souvenir<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Laplante, avenue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Magali et l&#8217;avenue Wilfrid-Pelletier<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Le Boutillier, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le 1268, boulevard Le Boutillier et le 1300 boulevard Le Boutillier<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Construction de trottoirs<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Ajout d&#8217;un trottoir du c\u00f4t\u00e9 sud.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 mois<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Le Corbusier, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Le Carrefour et le 2585, boulevard Le Corbusier<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Construction de trottoirs<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Ajout de trottoirs en asphalte des deux c\u00f4t\u00e9s du boulevard.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 mois<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Loranger, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Cur\u00e9-Labelle et la rue H\u00e9bert<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">McNamara, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Saint-Martin Ouest et la rue Maple<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Mercantile, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le chemin du Souvenir et la rue Ridgewood<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Montcalm, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la 92\u1d49 Avenue et la 95\u1d49 Avenue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Nobert, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Loranger et la rue Dufresne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Notre-Dame, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Cur\u00e9-Labelle et la rue Vincent-Massey<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9paration de trottoirs<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Notre-Dame, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Viaduc de l&#8217;autoroute 13<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e, r\u00e9paration des trottoirs et des barri\u00e8res de s\u00e9curit\u00e9.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>12 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Philippe-Lebon, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre John-Pratt et Cur\u00e9-Labelle<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Pavage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 semaine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Pierre-P\u00e9ladeau, avenue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Saint-Martin Ouest et l&#8217;avenue du Cosmod\u00f4me<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Renaud Ouest, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue de Verceil et le boulevard des Laurentides<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Ridgewood, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Elisabeth et le croissant Carol<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9paration de trottoirs<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Saint-Martin Ouest, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Fleetwood et la rue de Sillery (viaduc Saint-Martin Ouest)<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Saint-Martin Ouest, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Cur\u00e9-Labelle et le boulevard Chomedey<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>S\u00e9curisation et embellissement du boulevard Saint-Martin<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Voir section Travaux routiers d&#8217;envergure.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>nan<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Saint-Martin Ouest, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Chomedey et le boulevard Le Corbusier<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>S\u00e9curisation et embellissement du boulevard Saint-Martin<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Voir section Travaux routiers d&#8217;envergure<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>nan<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Saint-Martin Ouest, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Industriel et le boulevard des Laurentides<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>S\u00e9curisation et embellissement du boulevard Saint-Martin<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Voir section Travaux routiers d&#8217;envergure<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>nan<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Samson, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Viaduc de l&#8217;autoroute 13<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e, r\u00e9paration des trottoirs et des barri\u00e8res de s\u00e9curit\u00e9.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>12 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Souvenir, boulevard du<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Daniel-Johnson et le 3105, boulevard du Souvenir<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Terry-Fox, avenue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;avenue du Cosmod\u00f4me et le boulevard Le Carrefour<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div><\/div><\/section>\n\n\n\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"duvernay\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">Duvernay<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">11\u1d49 Avenue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Sainte-Rose et l&#8217;extr\u00e9mit\u00e9 de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Auteuil, boulevard d&#8217;<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard de la Concorde Est et le boulevard Saint-Martin Est<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Auvergne, rue d&#8217;<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue de Grand-Pr\u00e9 et la rue de l&#8217;Assomption<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Blois, boulevard de<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Leblanc et la rue Richer<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Cascades, place des<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;avenue des Tilleuls et l&#8217;avenue des Tilleuls<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Castels, rue des<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Fran\u00e7ois-Chartrand et la rue Kugler<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">C\u00e8dres, rue des<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue des Avocatiers et la rue des Sapins<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Charles-Garnier, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue des Forges et la rue Kl\u00e9ber<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement de la conduite d&#8217;aqueduc. R\u00e9duction de la largeur de la chauss\u00e9e et ajout d&#8217;infrastructures vertes drainantes.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Chavigny, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue K\u00e9bler et la rue Franch\u00e8re<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement des conduites d&#8217;\u00e9gout et d&#8217;aqueduc. R\u00e9duction de la largeur de la chauss\u00e9e et ajout d&#8217;infrastructures vertes drainantes.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">des Aristocrates, avenue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;avenue des Gouverneurs et la rue de la Comptesse<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Fontainebleau, rue de<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Levesque Est et la rue Victor-Hugo<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement de la conduite d&#8217;aqueduc. R\u00e9duction de la largeur de la chauss\u00e9e et ajout d&#8217;infrastructures vertes drainantes<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Franch\u00e8re, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Victor-Hugo et le boulevard L\u00e9vesque<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Fran\u00e7ois-Chartrand, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;avenue des P\u00e9licans et la place des Cascades<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Gouverneurs, avenue des<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;avenue des G\u00e9n\u00e9raux et l&#8217;avenue de l&#8217;Empereur<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Honfleur, rue de<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue de Grand-Pr\u00e9 et le croissant de La Picardi\u00e8re<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Kl\u00e9ber, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Charles-Garnier et la rue Victor-Hugo<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement de la conduite d&#8217;aqueduc. R\u00e9duction de la largeur de la chauss\u00e9e et ajout d&#8217;infrastructures vertes drainantes.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Kugler, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Lachance et la rue Fran\u00e7ois-Chartrand<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Leblanc, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard de Blois et la rue de Courcelle<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Louis-Arthur, croissant<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Pr\u00e8s du 2, croissant Louis-Arthur<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de puisards<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 semaine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Marronnier, rue du<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue des Avocatiers et la rue des C\u00e8dres<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Martinets, rue des<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue des M\u00e9sanges et la rue des Oies<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Masson, mont\u00e9e<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;avenue Marcel-Villeneuve et le 3355, mont\u00e9e Masson<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Prolongement de services municipaux et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Installation d&#8217;une conduite d&#8217;aqueduc. Pavage des accotements. Ajout de pistes polyvalentes unidirectionnelles de chaque c\u00f4t\u00e9 de la rue.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>\u00c0 confirmer<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Morlaix, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue de Grand-Pr\u00e9 et la rue de l&#8217;Assomption<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Rosem\u00e8re, rue de<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Roland-Forget et la rue Jeanne-Le-Ber<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Saint-Elz\u00e9ar Est, rang<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la mont\u00e9e Rouville et la mont\u00e9e Saint- Fran\u00e7ois<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Pavage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 semaine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Saint-Martin Est, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;avenue de la Mauricie et le boulevard Pie-IX<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>S\u00e9curisation et embellissement du boulevard Saint-Martin<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Voir section Travaux routiers d&#8217;envergure<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>nan<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Sapins, rue des<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue des Sapins\/\u00c9cole Notre-Dame-du-Sourire et le boulevard L\u00e9vesque Est<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Tangara, rue du<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue des Pinsons et le boulevard L\u00e9vesque<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Tilleuls, avenue des<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;avenue des P\u00e9licans et la place des Cascades<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Trembles, avenue des<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Pr\u00e8s de la rue des Pigeons<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Construction de trottoirs<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 mois<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Victor-Hugo, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Jeanne-Le Ber et la rue Franch\u00e8re<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement de la conduite d&#8217;aqueduc. R\u00e9duction de la largeur de la chauss\u00e9e et ajout d&#8217;une piste polyvalente sur\u00e9lev\u00e9e du c\u00f4t\u00e9 nord. Interdiction de stationnement du c\u00f4t\u00e9 nord.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div><\/div><\/section>\n\n\n\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"fabreville\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">Fabreville<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">2\u1d49 Avenue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Sainte-Rose et la 3\u1d49 Avenue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">3\u1d49 Avenue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Sainte-Rose et le chemin Saint-Antoine<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">4\u1d49 Avenue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Sainte-Rose et la rivi\u00e8re des Mille-\u00celes<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">5\u1d49 Avenue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Sainte-Rose et le chemin Saint-Antoine<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Chalutier, rue du<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le 1201, rue du Chalutier et l&#8217;extr\u00e9mit\u00e9 de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Prolongement de services municipaux<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Installation de conduites d&#8217;aqueduc et d&#8217;\u00e9gout sanitaire. Am\u00e9nagement de foss\u00e9s.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Cousteau, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Sainte-Rose et la rue S\u00e9guin<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Construction de trottoirs et pavage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Pavage de la rue. Ajout d&#8217;un trottoir. Am\u00e9nagement d&#8217;un parc canin.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 mois<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">\u00c9dith, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Isabelle et la rue Dalida<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">\u00c9douard, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue \u00c9dith et la rue \u00c9veline<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">\u00c9loi, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue \u00c9lie et la rue \u00c9douard<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Esther, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Flavien et la rue Florian<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement de la conduite d&#8217;aqueduc. Ajout d&#8217;une piste polyvalente sur\u00e9lev\u00e9e du c\u00f4t\u00e9 de l&#8217;\u00e9cole P\u00e9pin. R\u00e9duction de la largeur de la chauss\u00e9e et arr\u00eat interdit du c\u00f4t\u00e9 nord.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">\u00c9veline, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue \u00c9douard et la rue Eug\u00e8ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Flore, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Fernand et la rue Edgar<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">France, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Flore et la rue Fran\u00e7ois<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Gabriel, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Dagenais Ouest et le boulevard Cur\u00e9-Labelle<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Pavage des accotements et ajout de pistes polyvalentes unidirectionnelles.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Gibraltar, rue de<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le 1135, rue de Gibraltar et le 1136, rue de Barcelone<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Pavage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>15 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Herv\u00e9, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Harold et la rue Isabelle<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Hudon, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Isabelle et la rue Edgar<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement de la conduite d&#8217;aqueduc. Ajout d&#8217;une piste polyvalente sur\u00e9lev\u00e9e du c\u00f4t\u00e9 sud. R\u00e9duction de la largeur de la chauss\u00e9e et interdiction de stationnement du c\u00f4t\u00e9 nord.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Ignace, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Ivanhoe et la rue Irwin<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Lac-de-Mai, rue du<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Sainte-Rose et le 1250, rue du Lac-De-Mai<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e, reprofilage de foss\u00e9s et \u00e9clairage de rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>\u00c0 confirmer<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Lisane, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Dagenais Ouest et la rue Marian<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e, construction et r\u00e9fection de trottoirs<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Ajout d&#8217;un trottoir du c\u00f4t\u00e9 ouest entre la rue Martin et le boulevard Dagenais. R\u00e9fection du trottoir entre la rue Martin et la rue Marian.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 mois<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Marins, rue des<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue du Chalutier et l&#8217;extr\u00e9mit\u00e9 de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Prolongement de services municipaux<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Installation de conduites d&#8217;aqueduc et d&#8217;\u00e9gout sanitaire. Am\u00e9nagement de foss\u00e9s.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Martin, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Marquette et la rue Lisane<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Nicole, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Normand et la rue Marian<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Orph\u00e9e, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le 3673 et le 3693, rue Orph\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de puisards<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 semaine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Phare, rue du<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>\u00c0 partir du 1295, rue du Phare vers le nord<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Prolongement de services municipaux<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Installation d&#8217;une conduite d&#8217;aqueduc. Pavage de la rue. Am\u00e9nagement de foss\u00e9s.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Sainte-Rose, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le 4001 et le 4013, boulevard Sainte-Rose<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Construction de trottoirs<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 mois<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Sainte-Rose, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;autoroute 15 et la mont\u00e9e Montrougeau<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Pavage des accotements. Conversion de la piste bidirectionnelle en deux pistes unidirectionnelles<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div><\/div><\/section>\n\n\n\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"iles-laval\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">\u00celes-Laval<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<p>Aucuns travaux pr\u00e9vus.<\/p>\n<\/div><\/div><\/section>\n\n\n\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"laval-des-rapides\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">Laval-des-Rapides<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<p>Aucuns travaux pr\u00e9vus.<\/p>\n<\/div><\/div><\/section>\n\n\n\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"laval-ouest\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">Laval-Ouest<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<p>Aucuns travaux pr\u00e9vus.<\/p>\n<\/div><\/div><\/section>\n\n\n\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"laval-sur-le-lac\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">Laval-sur-le-Lac<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<p>Aucuns travaux pr\u00e9vus.<\/p>\n<\/div><\/div><\/section>\n\n\n\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"pont-viau\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">Pont-Viau<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<p>Aucuns travaux pr\u00e9vus.<\/p>\n<\/div><\/div><\/section>\n\n\n\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"sainte-dorothee\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">Sainte-Doroth\u00e9e<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">B\u00e9lec, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Filiatrault et la rue Marsil<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Bonaventure, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Pavage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 semaine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Castelnau, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Desjardins et le boulevard Sainte-Doroth\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Champagne, mont\u00e9e<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Anita et l&#8217;avenue des Bois<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Dautry, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Hodge et la rue de Lorne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Diane, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Joncas et le chemin du Bord-de-l&#8217;Eau<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Pavage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 semaine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Elsie-Redford, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Pavage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 semaine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">\u00c9tienne-Lavoie, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le 360 et le 870, rue \u00c9tienne-Lavoie<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9fection du mur de sout\u00e8nement et de l&#8217;\u00e9cran antibruit<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Continuit\u00e9 des travaux d\u00e9but\u00e9s en 2024. Construction de l&#8217;\u00e9cran antibruit et am\u00e9nagement paysager<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 mois<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Filiatrault, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Marsil et la rue B\u00e9lec<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Guise, place de<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Maurice et la rue Maurice<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement des conduites d&#8217;\u00e9gout et d&#8217;aqueduc. \u00c9largissement des trottoirs. Travers\u00e9e sur\u00e9lev\u00e9e \u00e0 l&#8217;intersection de la rue Maurice.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Marillac, place de<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Pr\u00e8s du 870, place de Marillac<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de puisards<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 semaine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Marsil, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Samson et la rue B\u00e9lec<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Maurice, place<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Maurice et la rue Maurice<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement des conduites d&#8217;\u00e9gout et d&#8217;aqueduc. \u00c9largissement des trottoirs et de l&#8217;il\u00f4t central. Travers\u00e9e sur\u00e9lev\u00e9e \u00e0 l&#8217;intersection de la rue Maurice.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Maurice, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue B\u00e9lec et le boulevard Samson<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement de la conduite d&#8217;aqueduc. Entre le boulevard Samson et la rue Murat : ajout d&#8217;un trottoir c\u00f4t\u00e9 ouest. R\u00e9duction de la largeur de chauss\u00e9e et interdiction de stationnement du c\u00f4t\u00e9 ouest. Entre la rue Murat et la rue B\u00e9lec : \u00c9largissement des trottoirs<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Miguasha, rue de<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Pavage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 semaine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Muguet, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Violette et le 545, rue Muguet<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement de la conduite d&#8217;aqueduc.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Notre-Dame, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le 245, boulevard Samson et la rue de la Lavat\u00e8re<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Ouellette, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue des Jardins-Sainte-Doroth\u00e9e et le chemin Du Bord-De-L&#8217;eau<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Pesant, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue des Coquelicots et la terrasse Pesant<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Samson, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre l&#8217;autoroute 13 et la rue Larivi\u00e8re<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Samson, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard de l&#8217;H\u00f4tel-de-Ville et le boulevard Notre-Dame<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Entre le boulevard de l&#8217;H\u00f4tel-de-Ville et la rue Maisonneuve : resurfa\u00e7age sur la trav\u00e9e nord. Entre la rue Maisonneuve et le boulevard Notre-Dame : resurfa\u00e7age des deux c\u00f4t\u00e9s.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Suzanne-Guit\u00e9, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Pavage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 semaine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Violette, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Marguerite et le boulevard Saint-Martin Ouest<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement de la conduite d&#8217;aqueduc. \u00c9largissement des trottoirs et des terre-pleins en r\u00e9duisant la largeur de la chauss\u00e9e.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>8 \u00e0 10 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div><\/div><\/section>\n\n\n\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"sainte-rose\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">Sainte-Rose<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Cantin, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Sainte-Rose et la rivi\u00e8re des Mille-\u00celes<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Chatelier, rue Le<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Michelin et le boulevard Le Corbusier<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Cur\u00e9-Labelle, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le 707, boulevard Cur\u00e9-Labelle et le boulevard Sainte-Rose<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Damien-Cyr, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le chemin de l&#8217;\u00c9querre et la rue Taillefer<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Delaunay, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Michelin et la rue Le Chatelier<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">\u00c9querre, rang de l&#8217;<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le chemin de l&#8217;\u00c9querre et le nouveau chalet<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Pavage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>40 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Honor\u00e9-Mercier, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Marc-Aur\u00e8le-Fortin et la rue Arthur-Buies<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Laguerrier, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Laguerrier et le boulevard Sainte-Rose<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Ombrette, rue de l&#8217;<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Le long de l&#8217;autoroute 15<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction de l&#8217;\u00e9cran antibruit<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>3 \u00e0 4 mois<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Patriotes, rue des<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Marc-Aur\u00e8le-Fortin et le boulevard de la Renaissance<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Renaissance, boulevard de la<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Cur\u00e9-Labelle et la rue des Patriotes<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Renaissance, boulevard de la<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue des Patriotes et la rue du Passerin<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Pavage<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 semaine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Sainte-Rose Est, boulevard<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le 50 et le 55, boulevard Sainte-Rose<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de puisards<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 semaine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Terrasses, avenue des<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue de la Pointe-aux-Ormes et la rue Saint-Paul<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9paration de piste cyclable<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 semaine<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Yvon-Berger, avenue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Corbin et l&#8217;autoroute des Laurentides<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div><\/div><\/section>\n\n\n\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"saint-francois\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">Saint-Fran\u00e7ois<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Ang\u00e8le, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue de l&#8217;Harmonie et l&#8217;avenue Huguette-Gaulin<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Balades, rue des<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Au nord de la rue L\u00e9onise-Lavoie<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Prolongement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Travaux de prolongement de la rue des Balades et d&#8217;une nouvelle rue.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>\u00c0 confirmer<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Charbonneau, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard des Mille-\u00celes et l&#8217;extr\u00e9mit\u00e9 de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Guindon, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue R\u00e9al et l&#8217;extr\u00e9mit\u00e9 nord<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">L\u00e9ry, rue De<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la mont\u00e9e du Moulin et la rue Duchesneau<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Resurfa\u00e7age de la chauss\u00e9e<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Myl\u00e8ne, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue de l&#8217;Harmonie et la rue L\u00e9a<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;aqueduc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>6 \u00e0 8 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Souart, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard des Mille-\u00celes et l&#8217;extr\u00e9mit\u00e9 de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div><\/div><\/section>\n\n\n\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"saint-vincent-de-paul\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">Saint-Vincent-de-Paul<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<p>Aucuns travaux pr\u00e9vus.<\/p>\n<\/div><\/div><\/section>\n\n\n\n<section class=\"wp-block-vortex-blocks-accordion-item accordion ac\" id=\"vimont\"><div class=\"accordion__accordion\"><button class=\"accordion__header-row accordion-toggle ac-header ac-trigger\"><p class=\"accordion__header__title\">Vimont<\/p><span class=\"accordion__header__icon\" role=\"presentation\"><span class=\"plus\"><\/span><\/span><\/button><div class=\"accordion__sub-rows wysiwyg ac-panel\" role=\"region\">\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Aim\u00e9-S\u00e9guin, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Aim\u00e9-S\u00e9guin et la rue de Jerez<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Aladin, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Prudentiel et la rue du Rucher<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Belgrade, rue de<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue de Rio et le boulevard Prudentiel<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Chaville, rue de<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Ren\u00e9-Laennec et la rue des Abeilles<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Cormiers, rue des<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Hameury et la rue de Rosem\u00e8re<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Goupil, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue Trevet et la rue Richmond<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Gruy\u00e8res, rue de<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue de Belgrade Est et la rue Milan<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Marc, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue de Milan et la rue Aladin<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Marc, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue de Tol\u00e8de et la rue de Milan<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines et r\u00e9am\u00e9nagement de la rue<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement et augmentation de la capacit\u00e9 de la conduite d&#8217;\u00e9gout sanitaire. Sur\u00e9l\u00e9vation et s\u00e9paration de la piste polyvalente avec une banquette v\u00e9g\u00e9talis\u00e9e.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>10 \u00e0 12 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Philippe-Pinel, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le boulevard Saint-Elz\u00e9ar et le boulevard Normand-Bethune<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Ajout de dos d&#8217;\u00e2ne<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>1 \u00e0 2 jours<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Richmond, rue<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue d&#8217;Orl\u00e9ans et la rue Goupil<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Ronceveaux, rue de<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre la rue d&#8217;Orl\u00e9ans et la rue Goupil<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>R\u00e9habilitation de la conduite d&#8217;\u00e9gout<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>2 \u00e0 3 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td class=\"has-text-align-left\" data-align=\"left\" colspan=\"2\">Tol\u00e8de, rue de<\/td><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Localisation\u00a0:<\/strong><\/td><td>Entre le 2225, rue de Tol\u00e8de et la rue Marc<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Type de travaux\u00a0:<\/strong><\/td><td>Reconstruction d&#8217;infrastructures souterraines<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Description\u00a0:<\/strong><\/td><td>Remplacement et augmentation de capacit\u00e9 de la conduite d&#8217;\u00e9gout sanitaire. Am\u00e9nagement d&#8217;un parc inondable.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Dur\u00e9e des travaux\u00a0:<\/strong><\/td><td>10 \u00e0 12 semaines<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div><\/div><\/section>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Prolongement des r\u00e9seaux cyclable et pi\u00e9tonnier<\/strong><\/h2>\n\n\n\n<p>Localisez les nouvelles pistes cyclables et les plus r\u00e9cents am\u00e9nagements pi\u00e9tonniers, et apprenez-en plus sur les \u00e9ventuels changements apport\u00e9s aux r\u00e8gles de stationnement de votre rue ou des rues avoisinantes. Cette carte est mise \u00e0 jour chaque ann\u00e9e.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/vl.maps.arcgis.com\/apps\/instant\/attachmentviewer\/index.html?appid=24531f9cecbb48b1ab836b520cab13bf\" target=\"_blank\" rel=\"noreferrer noopener\">Voir la carte<\/a><\/div>\n<\/div>\n\n\n\n<p>Pour localiser toutes les pistes cyclables, consultez plut\u00f4t la <a href=\"https:\/\/www.laval.ca\/carte-interactive\/\">carte interactive<\/a>.\u00a0<\/p>\n\n<\/div>\n\n\n<div class=\"sticky-section-sidebar\"\n>\n   <div class=\"sticky-section-sidebar__inner\">\n     \n\n<p><\/p>\n\n   <\/div>\n<\/div>\n\n<\/section>\n<section class=\"mixed-carousel mixed-carousel--custom alignfull\"\n>\n    \n<div class=\"heading-with-button container\">\n      <h2 class=\"heading-with-button__title\">Pour aller plus loin<\/h2>\n    <\/div>\n    <div class=\"mixed-carousel__carousel-wrapper\">\n      <div class=\"mixed-carousel__carousel swiper\">\n        <div class=\"swiper-wrapper\">\n                      \n<div class=\"mixed-item swiper-slide aligndefault mixed-item--landscape-thumbnail\">\n  <a class=\"mixed-item__inner\" href=\"https:\/\/www.laval.ca\/travaux-deplacements\/travaux\/chantiers-routiers\/travaux-routiers-menes-partenaires\/\">    <div class=\"mixed-item__thumbnail-wrapper\">\n      <img decoding=\"async\" width=\"395\" height=\"222\" src=\"https:\/\/www.laval.ca\/wp-content\/uploads\/2025\/10\/Travaux-partenaires.jpg\" class=\"attachment-medium_large size-medium_large\" alt=\"\" sizes=\"(min-width:1216px) 430px, (min-width:1080px) 36vw, (min-width:768px) 41vw, (min-width:560px) 60vw, 85vw\" srcset=\"https:\/\/www.laval.ca\/wp-content\/uploads\/2025\/10\/Travaux-partenaires.jpg 395w, https:\/\/www.laval.ca\/wp-content\/uploads\/2025\/10\/Travaux-partenaires-300x169.jpg 300w\" \/>    <\/div>\n    <h3 class=\"mixed-item__title\"><span>Travaux men\u00e9s par les partenaires <\/span><\/h3>\n          <p class=\"mixed-item__excerpt\">Informez-vous sur les travaux en cours. <\/p>\n      <\/a><\/div>\n\n\n<div class=\"mixed-item swiper-slide aligndefault mixed-item--landscape-thumbnail\">\n  <a class=\"mixed-item__inner\" href=\"https:\/\/www.laval.ca\/travaux-deplacements\/travaux\/apaisement-circulation\/\">    <div class=\"mixed-item__thumbnail-wrapper\">\n      <img decoding=\"async\" width=\"395\" height=\"222\" src=\"https:\/\/www.laval.ca\/wp-content\/uploads\/2025\/10\/Apaisement-circulation.jpg\" class=\"attachment-medium_large size-medium_large\" alt=\"\" sizes=\"(min-width:1216px) 430px, (min-width:1080px) 36vw, (min-width:768px) 41vw, (min-width:560px) 60vw, 85vw\" srcset=\"https:\/\/www.laval.ca\/wp-content\/uploads\/2025\/10\/Apaisement-circulation.jpg 395w, https:\/\/www.laval.ca\/wp-content\/uploads\/2025\/10\/Apaisement-circulation-300x169.jpg 300w\" \/>    <\/div>\n    <h3 class=\"mixed-item__title\"><span>Apaisement de la circulation<\/span><\/h3>\n          <p class=\"mixed-item__excerpt\">Dos d\u2019\u00e2ne, vitesse r\u00e9duite, radars photos\u2026 D\u00e9couvrez les mesures adopt\u00e9es par la Ville.<\/p>\n      <\/a><\/div>\n\n\n<div class=\"mixed-item swiper-slide aligndefault mixed-item--landscape-thumbnail\">\n  <a class=\"mixed-item__inner\" href=\"https:\/\/www.laval.ca\/travaux-deplacements\/stationnement\/se-stationner-dans-rue\/\">    <div class=\"mixed-item__thumbnail-wrapper\">\n      <img decoding=\"async\" width=\"609\" height=\"350\" src=\"https:\/\/www.laval.ca\/wp-content\/uploads\/2025\/02\/sationnement-rue-header.gif\" class=\"attachment-medium_large size-medium_large\" alt=\"\" sizes=\"(min-width:1216px) 430px, (min-width:1080px) 36vw, (min-width:768px) 41vw, (min-width:560px) 60vw, 85vw\" \/>    <\/div>\n    <h3 class=\"mixed-item__title\"><span>Se stationner dans la rue<\/span><\/h3>\n          <p class=\"mixed-item__excerpt\">Informez-vous sur les op\u00e9rations d\u2019entretien en cours.<\/p>\n      <\/a><\/div>\n\n\n                  <\/div>\n      <\/div>\n    <\/div>\n    <div class=\"mixed-carousel__carousel-navigation container\">\n      <div class=\"swiper-button-prev\"><\/div>\n      <div class=\"swiper-button-next\"><\/div>\n    <\/div>\n      \n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Pour pr\u00e9parer vos d\u00e9placements, voici ce que vous devez savoir sur les travaux men\u00e9s pr\u00e9sentement par la Ville et ceux \u00e0 venir.\u00a0<\/p>\n","protected":false},"author":23,"featured_media":0,"parent":26987,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"advgb_blocks_editor_width":"","advgb_blocks_columns_visual_guide":"","footnotes":""},"class_list":["post-26795","page","type-page","status-publish","hentry"],"pp_statuses_selecting_workflow":false,"pp_workflow_action":"current","pp_status_selection":"publish","acf":[],"coauthors":[],"author_meta":{"author_link":"https:\/\/www.laval.ca\/en\/author\/mar-longprelaval-ca\/","display_name":"mar.longpre@laval.ca"},"relative_dates":{"created":"Posted 1 year ago","modified":"Updated 2 months ago"},"absolute_dates":{"created":"Posted on December 1, 2024","modified":"Updated on March 3, 2026"},"absolute_dates_time":{"created":"Posted on December 1, 2024 12:02 pm","modified":"Updated on March 3, 2026 9:55 am"},"featured_img_caption":"","featured_img":false,"series_order":"","publishpress_future_action":{"enabled":false,"date":"2026-05-02 07:48:50","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"translation_priority","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.laval.ca\/en\/wp-json\/wp\/v2\/pages\/26795","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.laval.ca\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.laval.ca\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.laval.ca\/en\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/www.laval.ca\/en\/wp-json\/wp\/v2\/comments?post=26795"}],"version-history":[{"count":9,"href":"https:\/\/www.laval.ca\/en\/wp-json\/wp\/v2\/pages\/26795\/revisions"}],"predecessor-version":[{"id":107839,"href":"https:\/\/www.laval.ca\/en\/wp-json\/wp\/v2\/pages\/26795\/revisions\/107839"}],"up":[{"embeddable":true,"href":"https:\/\/www.laval.ca\/en\/wp-json\/wp\/v2\/pages\/26987"}],"wp:attachment":[{"href":"https:\/\/www.laval.ca\/en\/wp-json\/wp\/v2\/media?parent=26795"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}